West Metro interlocking system project, 2015 – 2017
West Metro interlocking system project, 2015 – 2017
A TOTAL SOLUTION SUITABLE FOR THE WEST METRO ENVIRONMENT WITHIN A TIGHT SCHEDULE
Mipro has delivered the interlocking and ATS systems and the passenger information system for the new West Metro line, the western metro extension of the existing Helsinki metro.
For the new rail line of 14 kilometres, Mipro delivered a centralised system solution based on the existing infrastructure. Mipro adapted its solution to the requirements set by the existing track equipment locations, cable tunnels, power supply, data communication and equipment rooms to enable safe and efficient construction of the solution one station at a time.
Mipro’s system project for the new metro line commenced at the end of March 2015, and the interlocking system delivered by Mipro was accepted and taken over successfully in August 2017.
MIPRO’S DELIVERY SCOPE:
Interlocking system
ATS Automatic Train Supervision system
Passenger information system
Interfaces to other systems
Interfaces to Helsinki metro
Track equipment
Mipro has installed, among other things nine SIL4-level interlocking systems and 174 signals for the control of West Metro.
Mipro had total responsibility for delivery of the interlocking and ATS systems for the West Metro line. Consequently, the large number of contractors, subcontractors and other parties involved in the project required accurate and comprehensive project management.
Good co-operation with the customer, high-level knowledge and the commitment of each party played a significant role in this project, which had an exceptionally tight schedule. Strict adherence to the schedule, continuous communication between all parties and a clear definition of responsibilities were required to ensure smooth progression of the project and the desired end result.
CO-OPERATION WITH MIPRO IS SEAMLESS, AND PROJECTS ALWAYS EXCEED EXPECTATIONS.
FACTS AND FIGURES OF WEST METRO
28 kilometres of track in total
8 new stations
170 000 passengers every day
The highest permissible speed is 80 km/h
The current traffic frequency of 4 minutes at the maximum will fall to 2.5 minutes after commissioning
Two parallel shafts
The West Metro project has been a large-scale infrastructure project. It employeed hundreds of designers and thousands of construction workers, and indirectly thousands of subcontractors.
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Strictly Necessary Cookies
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.
3rd Party Cookies
This website uses Matomo Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.
Keeping this cookie enabled helps us to improve our website.
Please enable Strictly Necessary Cookies first so that we can save your preferences!